The Oak Ridge K-25 Site occupies 600 hectares (1,500 acres) within the Oak Ridge
Reservation adjacent to the Clinch River, approximately 21 kilometers (13
miles) west of downtown Oak Ridge, Tennessee. To view the Locality Map for the
K-25 Site, see the Oak Ridge Associated Universities site summary.
LOCALITY MAP
Estimated Site Total
| (Thousands of Current Year Dollars)
|
| |
|
|
|
| Environmental Restoration
|
107,656
|
98,221
|
412,510
|
425,822
|
440,369
|
Grey shaded area reflects annual cost
estimates for the first five years of the site BEMR Base Case (as of October
1995) and includes 3% annual inflation, see Readers' Guide.
|
| Waste Management
|
69,598
|
69,544
|
95,016
|
101,239
|
108,617
|
|
| Directly Appropriated Landlord
|
17,969
|
17,953
|
21,691
|
21,649
|
32,690
|
|
| Total |
195,223
|
185,717
|
529,217
|
548,710
|
581,676
|
|
| 1996 Appropriation
|
177,699 |
|
|
These levels reflect the current estimates for
compliance with applicable statutes and agreements (as of March 1996), see
Readers' Guide.
|
| 1997 Congressional Request
|
|
131,275
|
|
|
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
|
| Environmental Restoration
|
274,559 |
352,454
|
75,687
|
19,883
|
18,829
|
55,683
|
39,690
|
|
| Waste Management
|
83,166
|
72,376
|
58,487
|
60,057
|
56,129
|
8,013
|
|
|
| Directly Appropriated Landlord
|
20,940
|
28,221
|
27,242
|
27,242
|
27,242
|
27,242
|
27,242
|
|
| Total |
378,666
|
453,051
|
161,416
|
107,182 |
102,199
|
90,937
|
66,932
|
|
| |
2050
|
2055
|
2060
|
2065
|
| Environmental Restoration
|
36,782
|
15,329
|
4,222
|
|
|
|
|
4,465,584
|
| Waste Management
|
|
|
|
|
|
|
|
1,691,141
|
| Directly Appropriated Landlord
|
20,254
|
13,503
|
6,751
|
|
|
|
|
1,129,395
|
| Total |
57,036
|
28,832
|
10,973
|
|
|
|
|
7,286,120
|
| * Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
FACILITY MISSION
The K-25 plant was built as part of the Manhattan Project during World War II
to supply enriched uranium for nuclear weapons production. Construction of the
K-25 Site started in 1943 with the K-25 Building, the first diffusion facility
for large-scale separation of uranium-235. The K-25 Building was fully operable
by August 1945. Additional buildings involved in the enrichment process were
operable by 1956. Through 1964, the site was used primarily for the production
of highly enriched uranium for nuclear weapons. In response to the national
postwar emphasis on nuclear power, plant operations were modified to include
the production of uranium compatible with reactors used to generate electric
power. From 1959 to 1969, the focus shifted to the production of
commercial-grade, low-enrichment uranium. Because of the declining demand for
enriched uranium, the enrichment process was placed on standby in 1985 and shut
down permanently in 1987. The site was also a host for centrifuge facilities
constructed as part of a program to develop and demonstrate uranium-enrichment
technology. These facilities have also been shut down.
The current multipurpose mission of the K-25 Site includes environmental
restoration, waste management, technology development and demonstration,
education and training, and technology transfer for the Department of Energy,
other agencies, and the public through innovative leadership and cost-effective
management. In support of this mission, the K-25 Site was designated the Center
for Environmental Technology and the Center for Waste Management in May 1993.
The pursuit and planning for industrial reuse of the site by parties other than
the Department of Energy has become an important mission at the site.
Waste management facilities are operated onsite to treat or store waste
generated by ongoing operations at K-25 and other sites on the Oak Ridge
Reservation, including waste from environmental cleanup. Waste is also prepared
for transfer offsite for treatment or disposal. The most notable facility at
the K-25 Site is the incinerator built to comply with the Toxic Substances
Control Act. It is the world's only operating, permitted mixed waste
incinerator. The site conducts waste management according to the requirements
of the Resource Conservation and Recovery Act, Department of Energy Orders, and
other federal and state laws.
SITE MAP
A primary mission of the K-25 Site is to carry out ongoing environmental
remediation activities so that the site can be reused. Activities are
continuing to assess the condition and contamination of K-25 Site areas and
facilities and to decide how contamination can be contained or cleaned up.
Containment and cleanup are progressing as funding becomes available according
to priorities set by evaluations of risk to the public and the environment.
Placement of the former gaseous diffusion facilities in a safe shutdown
condition has allowed a shift to full-scale decommissioning of some structures.
Initial decommissioning has focused on demolition of cooling towers and a large
powerhouse structure. The K-25 Site has been placed on the Environmental
Protection Agency's National Priorities List as a part of the Oak Ridge
Reservation. A Federal Facilities Agreement signed by the Department of Energy,
the Environmental Protection Agency Region IV, and the State of Tennessee
provides a framework for environmental restoration.
The estimate for decommissioning the K-25 Gaseous Diffusion Facilities in this
report takes into account an approach for recycling process equipment and other
radioactive metals into usable products and onsite disposal of low-level and
mixed radiological waste. Although this estimate is still preliminary, and not
yet in the environmental restoration life-cycle baseline, it adopts a much
simpler and less restrictive approach for dealing with these radiologically
contaminated facilities. To take advantage of the need for the usable products
that are expected to be produced in this scenario, this estimate assumes that
the work can begin as early as FY 1998.
The K-25 Site currently has no Nuclear Material and Facility Stabilization
program activity. It is an Environmental Management program site with
stabilization work (for example, uranium deposit removal) described in a later
decommissioning section. This estimate assumes that the Environmental
Management program will remain the landlord at the site for the life cycle of
this estimate.
FUTURE USE
The Department of Energy has been using the Common Ground Process to make
strategic plans regarding the ultimate future use of the Oak Ridge Reservation
and the K-25 Site. It is a stakeholder-driven process to determine preferred
land-use options for the Oak Ridge Reservation so that cleanup operations can
be based on the most likely and acceptable land uses. The land uses recommended
by the Department of Energy as a result of the Common Ground Process are used
for planning facility use and reuse for the next 25 years. The Department of
Energy will revise land-use plans at the Oak Ridge Reservation regularly to
reflect recommended changes and new information.
The land-use assumptions discussed reflect established agreements (that is,
approved by Feasibility Studies and Records of Decisions) reached with the
Tennessee Department of Environment and Conservation, the Environmental
Protection Agency, and the Department of Energy. Land-use recommendations are
based on the decisions reached by the Department, using input from the Common
Ground report, which included recommendations to consider a range of feasible
future land-use options; identify national needs and goals, evaluate the
opportunities and constraints of alternative uses; take into account legal,
physical, socioeconomic, technological, and cost considerations; and consider
the perspectives of the Department of Energy and all interested parties.
For the next 25 years, the land use for most of the K-25 Site is proposed as
Industrial, with restricted access. This category was chosen because the
infrastructure and proximity to utilities and transportation of the K-25 Site
are expected to attract industry to the site. Because the K-25 Site no longer
has a national mission, industrial reuse of this site will contribute to the
development of future economic opportunities for this region. This estimate
assumes that long-term (greater than 25 years) uses of the K-25 Site will
remain Industrial. See the Future Use Map located in the Oak Ridge Associated
Universities site summary.
The Department of Energy is investigating the reuse of the gaseous diffusion
process buildings. However, the decommissioning estimate in this report assumes
that all gaseous diffusion process buildings will eventually be removed to
grade. The site landscape will be significantly changed, with low disposal
mounds where former structures stood. To the extent practical, auxiliary
building rubble will be placed in one of the process building mounds. An onsite
disposal cell will undergo closure and will be under long-term monitoring by
the Department of Energy. Other facilities (for example, centrifuge facilities)
will be reused for other Industrial activities consistent with the
stakeholders' land-use decision for the site.
The Department of Energy will maintain control of approximately 20 hectares (50
acres) of the waste disposal areas indefinitely. These areas, which were used
for subsurface disposal of classified material from the gaseous diffusion and
centrifuge processes, will retain access controls appropriate for the
classification levels of the buried materials.
ENVIRONMENTAL RESTORATION
Most of the K-25 Site's process facilities were constructed in the 1940s and
1950s. The waste that was generated at the time, as well as much of the
construction material, process fluids, and auxiliary materials used in the
gaseous diffusion process, are now considered hazardous and are regulated under
today's standards. Most past operations generated plating waste, waste
solutions, trash contaminated with radioactivity, debris, and other materials
capable of polluting the environment. Environmental pollution resulted from
accidental leaks, spills, and discharges of radionuclides or chemicals into the
environment. It also resulted from the migration or deposition of contaminants
from the K-25 Site during gaseous diffusion operations or from storage and
burial grounds once deemed acceptable under standards in existence at that
time.
These facilities currently shutdown at the K-25 Site contain large quantities
of asbestos; oils; and equipment containing polychlorinated biphenyls,
coolants, lubricating oils, and radioactive materials. The Department will
manage these materials in place until they can be removed and treated, stored,
or disposed. In many of the facilities, contamination has become fixed on
equipment and structures, and these must be handled as hazardous or low-level
radioactive waste. The facilities also hold special nuclear material, residual
radionuclides (mainly uranium), and classified hardware and materials to be
managed in place until appropriately dispositioned. Waste liquids in the
shutdown K-25 facilities have been removed.
Remedial action is addressing contamination in soils, ground water, surface
waters, and old waste sites. Unless there is an immediate threat to the
environment, safety, and/or health, these contaminants will be managed in place
until remediation can be completed. After remediation, the site will still
require institutional controls. Some areas, such as old waste disposal grounds,
will not be available for other uses in the future. This report assumes that
other areas will be used for Industrial purposes in the future.
Operable units consisting of solid waste management units have been identified
for environmental restoration at the K-25 Site. Most operable units will
proceed through the formal remediation process of a remedial investigation,
feasibility study, remedial design, remedial action, and verification. Some
units may encompass areas requiring interim actions as new information becomes
available.
Pollution control activities are managed under the surveillance and maintenance
programs for both decommissioning facilities and remedial action facilities.
These programs monitor and control releases from managed environmental
restoration sites to prevent further pollution of the environment.
Remedial action activities are discussed under Main Plant, External Plant Area,
and Ground Water sections. This report assumes that, in the area surrounding
the gaseous diffusion facilities, the program will also perform remedial action
activities for the soil, support structures, and utilities around the large
process buildings. This area is known as the Process Plant Area. The Pond Waste
Management Project is defined as a distinct remedial activity and is discussed
separately. Surveillance and maintenance of remedial action sites is a combined
activity for the entire plant and is also discussed separately. Decommissioning
activities include all projects managed under that program, including
surveillance and maintenance of facilities in the decommissioning program.
Remedial action activities are specific to separate areas of the plant, whereas
decommissioning and surveillance and maintenance activities pertain to the
entire plant site.
Although the Environmental Restoration program's primary mission is to
remediate contaminated sites and decommission facilities, it may also be
responsible for some of the associated costs for treatment, storage, and
disposal for some of its activities. To manage the waste associated with
environmental restoration activities, onsite and commercial options are
evaluated. Evaluations are based on the activities conducted and the risk
associated with those activities, and the cost of onsite versus commercial
capability. In performing these option evaluations, the Environmental
Restoration program, with the support of the Waste Management program, prepares
waste management plans, and develops project specifications and waste
management documentation.
If waste treatment, storage, and disposal are to be performed onsite, all
associated activities and costs are included within the scope of the Waste
Management program. Because offsite treatment, storage, and disposal costs can
appear in either Environmental Restoration or Waste Management program
estimates, each of the area discussions below will identify the organization
responsible for associated costs.
Major Environmental Restoration Activity Milestones
| Main Plant Area
|
|
Assessment
|
2035
|
|
Remedial Action
|
2045
|
|
External Plant Area
|
|
Assessment
|
2025
|
|
Remedial Action
|
2045
|
|
Process Plant Area
|
|
Assessment
|
2030
|
|
Remedial Action
|
2045
|
|
Pond Waste Management Project
|
|
Remedial Action
|
2001
|
|
Ground Water
|
|
Assessment
|
2040
|
|
Remedial Action
|
2045
|
|
Decommissioning Area Actions
|
|
Assessment
|
2005
|
|
Facility Decommissioning
|
2040
|
|
Long-Term Surveillance and Monitoring
|
2045
|
Main Plant Area
The Main Plant area includes the Main Plant laboratory at the K-25 Site,
centrifuge enrichment facilities, administrative areas, several ponds, waste
accumulation areas, cooling towers, acid pits, and burial grounds. The area is
contaminated with a variety of hazardous and mixed waste resulting from
operations at the gaseous diffusion facilities and laboratories in the Main
Plant. Major remedial action projects in the Main Plant are the
K1407 B and C Ponds, the K1070 C/D Burial Grounds, and the
SW31 Seep.
ASSESSMENT
The K1407 B and C Ponds were assessed under a Resource Conservation
and Recovery Act closure process. Pond closure was completed in FY 1995 under
the Comprehensive Environmental Response, Compensation and Liability Act;
however, remaining assessment activities include post-closure monitoring
primarily for volatile organic compounds and technetium-99. This estimate
assumes that these activities will be completed by FY 2001. The ground-water
operable unit is addressing ground-water assessment (SW-31 Seep).
The K1070 C/D Burial Grounds are being assessed under the
Comprehensive Environmental Response, Compensation, and Liability Act Remedial
Investigation/Feasibility Study process. Remedial Investigation activities were
completed prior to FY 1995. These included sampling of soil, surface water,
sediment, and ground water and the installation of unconsolidated zone and
bedrock zone ground-water monitoring wells. Results of the Remedial
Investigation indicated contamination due to organics and radionuclides in soil
and ground water. Removal actions are planned to address two specific areas of
contamination within the unit: (1) radiological contamination (principally
uranium and technetium) and organic contamination (including chlorinated
solvents, hydrocarbons, and polychlorinated biphenyls) surrounding the Concrete
Pad; and (2) organic contamination (primarily chlorinated solvents) migrating
from the G-Pit. The draft Remedial Investigation/Feasibility Study report has
been submitted to
the regulators for review, and completion is anticipated in FY 1996. This
report assumes that assessments for the K-1070 C/D Operable Unit will be
completed by FY 2004.
The K-1004-J Vaults Remedial Site Evaluation assessed direct radiation exposure
due to residual radiological contamination beneath the building floor and
within the shallow vaults. No near-term remedial actions are assumed to be
required in this estimate. However, this report assumes that removal of some
hazardous soil and debris will be required in the long-term future. This
estimate assumes that all assessments for the Main Plan Area will be completed
by FY 2035.
Future assessments will include investigations of tanks, other small
contaminated units, and containment structures in locations with larger areas
of contamination. This estimate assumes that all assessments for the Main Plant
Area will be completed by FY 2035.
REMEDIAL ACTION
The K1407 B and C Ponds are currently undergoing post-closure
activities. Operation of the K1407 area has been transferred to the
Inactive Waste Sites Surveillance and Maintenance program, which will post the
former ponds as underground radioactive contamination areas. This report
assumes that remedial actions for the K-1407 B and C Ponds will be completed by
FY 1996.
Removal actions are currently being considered for the G-Pit and Concrete Pad
portions of the K1070 C/D Burial Grounds. Removal of the Concrete Pad
is planned to include concrete and contaminated soil, which will be disposed of
offsite. Remedial action for the G-Pit is planned to include in situ
vitrification of waste within the pit and secondary contaminated soil source
surrounding the pit. Development of a proposed plan and Record of Decision for
the operable unit will begin in FY 1996 and remedial design/remedial action
procurement activities will begin in FY 1997. Deliverables will be part of the
Federal Facilities Agreement prioritization for each year. The assumed remedial
action for the remaining trenches and pits is capping, ground-water monitoring,
and institutional controls. This estimate assumes that remedial actions will be
completed by FY 2030. This estimate also assumes that any solid waste from the
K-1070 C/D Burial Grounds will be shipped offsite for commercial treatment and
disposal. The associated costs for this activity are included within the scope
of remedial action.
Construction of a contaminated ground-water intercept and truck loading station
at the SW31 Seep was completed in FY 1994 as an interim remedial measure
under the Comprehensive Environmental Response, Compensation, and Liability
Act. Ground water contaminated primarily with chlorinated solvents discharges
at the SW-31 Seep at a rate of approximately 18,950 liters (5,000 gallons) per
day. A Remedial Action Report will be prepared as part of the Federal
Facilities Agreement prioritization. Operation of the intercept, including
interim collection, transport, and treatment of approximately 18,950 liters
(5,000 gallons) per day, will continue. Construction of the Central
Neutralization Facility upgrades will be completed in FY 1996 for treatment of
the collected ground water.
Other future remedial actions will include removal of tanks, other smaller
contaminated units, and containment structures in locations with larger areas
of contamination. This estimate assumes that all remedial actions for the Main
Plant Area will be completed by FY 2045.
This report assumes that approximately 375 cubic meters (491 cubic yards) of
solid low-level mixed waste (mostly soil) and 5 cubic meters (6.6 cubic yards)
of hazardous solid waste generated by remedial actions at the Main Plant Area
will be left in place. The remaining quantities of waste generated by remedial
actions will be transferred to the K-25 Site Waste Management program. These
include 1,304 cubic meters (1,708 cubic yards) of solid low-level mixed waste
(mostly soil), 485 cubic meters (635 cubic yards) of low-level mixed
liquids/wastewater, 8 cubic meters (10.5 cubic yards) of solid hazardous waste,
10 cubic meters (13.1 cubic yards) of liquid hazardous waste, and 38 cubic
meters (49.8 cubic yards) of sanitary waste.
External Plant Area
The external plant area includes two operable units west of the K-25 Site and
outside the perimeter fence. The K-901 Operable Unit contains the following
release units: a burial ground, a landfarm, the north disposal area, the south
disposal area, and a holding pond. The K-770 Operable Unit contains the
following release sites: the beryllium building, contaminated debris, the
scrap-metal yard, a switchyard, the property sales building, sludge beds and
Imhoff tanks, and the storage building for waste regulated under the Resource
Conservation and Recovery Act. The coal and bottom-ash pile listed as an early
action is also present. Five study areas have single release sites; one study
area has three release sites.
ASSESSMENT
Focused Remedial Investigations continued in FY 1995 for the K901 Holding
Pond and the K1070A Burial Ground. A Remedial
Investigation/Feasibility Study process is addressing the two focus sites in
accordance with the Oak Ridge Federal Facilities Agreement. A screening-level
risk evaluation has been drafted for the K901 Holding Pond and is under
review by the regulators. The Remedial Site Evaluation for the K-901-A holding
pond assessed existing data and results of surface-water, sediment, and
ecological toxicity testing to screen human health and ecological risks. The
results of the Remedial Site Evaluation concluded that the holding pond
currently poses unacceptable risks to human and ecological receptors, primarily
because of polychlorinated biphenyls in fish. Additional Remedial Investigation
activities are planned in FY 1996 for the K-901A holding pond and a
related K-1007-P Pond. This estimate assumes that characterization activities
will include testing surface water, sediment, and ecological samples.
In FY 1995, the re-evaluation of data quality objectives for the
K1070A Burial Grounds changed the course of the investigation.
Because of the presence of large voids in the karstic bedrock beneath the site,
the focus of the investigation shifted from ground-water control to source
control. The focused Remedial Investigation of the K-1070-A Burial Ground
collected soil, ecological, and ground-water samples, installed unconsolidated
zone and bedrock zone ground-water monitoring wells, and completed geological
characterization (for example, microgravity) data. Additional Remedial
Investigation activities planned for FY 1996 include a dye tracer study and
additional source-term sampling of trench leachate, soil, and ground water.
Preliminary results confirm contamination in soil and ground water due to
organics, metals, and radionuclides. A focused Remedial
Investigation/Feasibility Study report will be produced in late FY 1996
summarizing the results of the focused investigation, apparent risks, and
alternative remedial actions for source control. The deliverables will be part
of the Federal Facilities Agreement prioritized activities. This report assumes
that assessments for the K-1070-A Operable Unit will be completed by FY 1997.
Remedial Investigations for the remaining areas within the K901 Operable
Unit and for areas within the K-770 Operable Unit are scheduled after FY 2000.
Former disposal areas within the K-901 Operable Unit will be investigated in
addition to the nature and extent of ground water contaminated with volatile
organic compounds. The K-770 Remedial Investigation will target soils in the
former scrap yard and powerhouse area contaminated primarily with radionuclides
and metals. However, this estimate assumes that all assessments for the K-901
Operable Unit and the K-770 Operable Unit will be completed in FY 2025 and FY
2015, respectively.
The K-25 Site Contractor Spoil Area Remedial Site Evaluation reviewed waste
inventory records and results of ground-water seep analyses to check for
potential contamination. The results of the Remedial Site Evaluation concluded
that contamination is not observed and No Further Action is planned.
Future assessments will include investigations of the K-1515-F Land Treatment
Study Area; the Area 8 Study Area; the K-1085 Firehouse Study Area; K-1099
Blair Quarry Study Area; the Flannigan's Loop Study Area; the K-1654-A Waste
Tank Study Area; and the K-725 Beryllium Building Removal. This report assumes
that assessments for these areas will be completed by FY 2003.
This report assumes that all assessment activities for the External Plant Areas
will be completed by FY 2025.
REMEDIAL ACTION
Based on results of the draft screening risk evaluation for the K901-A
Holding Pond, remedial actions are being planned for near-term protection of
human and ecological receptors from ingestion of fish contaminated with
polychlorinated biphenyls and from contact with contaminated sediment. The
assumed remedial action for the holding pond is to place a geotextile fabric
over the contaminated sediments, install a fence, and replace the fish
population with uncontaminated individuals. Alternative removal actions will be
assessed in an Engineering Evaluation/Cost Analysis for the pond. This estimate
assumes that some source control will be required involving the removal of both
hazardous waste and low-level mixed waste, and it will be complete in FY 1996.
This report assumes that the Department will initiate remedial actions such as
containment or in-place treatment for the K1070A Burial Grounds to
address near-term risks. Stakeholders have not considered specific actions at
this time. Long-term remedial actions will be considered following completion
of the full Remedial Investigation/Feasibility Study for the K901 Operable
Unit. However, for the purpose of this estimate, remedial actions at the K-901
Operable Unit will be completed by FY 2045.
Remedial action assumptions for the K-770 Operable Unit are No Further Action
for the contaminated debris and Imhoff Tanks. A plastic geomembrane will be
placed over the contaminated soils in the K-770 Scrap Yard, covering a pile of
soil 15 feet high and one acre in extent. For the K-709 Switchyard,
polychlorinated biphenyl-contaminated soils will be excavated to a depth of
about 3 meters (ten feet). This estimate assumes that remedial actions at the
K-770 Operable Unit will be completed by FY 2025.
These activities will involve coordination with the Waste Management program,
particularly if source control for the K1070-A Burial Grounds includes
excavation with offsite disposal of the waste, and the K-709 Switchyard
remedial action includes excavation of polychlorinated biphenyl-contaminated
soils, as assumed in this estimate. This report assumes that any solid waste
will be shipped offsite for commercial treatment and disposal.
This report assumes that all remedial action activities for the External Plant
Area will be completed by FY 2045.
This report assumes that approximately 91 cubic meters (119 cubic yards) of
low-level mixed radioactive soil and 44 cubic meters (57.6 cubic yards) of
hazardous waste soil generated by remedial actions at the External Plant Area
will be left in place. The remaining quantities of waste generated by remedial
actions will be transferred to the K-25 Site Waste Management program. These
include approximately 238 cubic meters (312 cubic yards) of solid low-level
mixed waste, 300 cubic meters (393 cubic yards) of low-level mixed
liquids/wastewater, 6 cubic meters (7.9 cubic yards) of solid low-level
radioactive waste, 9 cubic meters (11.8 cubic yards) of liquid low-level
radioactive waste, 622 cubic meters (815 cubic yards) of solid hazardous waste
(mostly soil), 229 cubic meters (300 cubic yards) of liquid hazardous waste,
and 61 cubic meters (80 cubic yards) of sanitary waste.
Process Plant Area
While the K-25 Site Environmental Restoration program performs decommissioning
of the plant facilities, it will also investigate and clean up the contaminated
areas, utilities, and small support structures around the facilities such as
tanks, spill sites, and underground piping, which comprise the Process Plant
Area.
ASSESSMENT
This report assumes that investigation of the areas will follow the
requirements of the Comprehensive Environmental Response, Compensation, and
Liability Act with the required Remedial Investigation/Feasibility Study and
Record of Decision. This report assumes that these assessments will be
completed in FY 2030. Assessments to date have been very limited. This area is
under the overall ground-water monitoring program.
REMEDIAL ACTION
Because contamination in this area is assumed to be minimal, the anticipated
remedial approach will include leaving contamination in place and covering the
area with a wide area cap, or including it as a part of the decommissioning
rubble caps. In addition, this report anticipates that most of the underground
utilities will be grouted and that some tanks will be removed. This estimate
assumes that there will be some soil consolidation under the cap and that some
contaminated soil will be sent to the K-25 Site Waste Management program. It
also assumes that all remedial action activities at the Process Plant Area will
be completed by FY 2045.
This report assumes that approximately 96 cubic meters (126 cubic yards) of
hazardous soil generated by remedial actions will be left in place. The
remaining quantities of waste generated by remedial actions will be transferred
to the K-25 Site Waste Management program. These include approximately 50 cubic
meters (65.5 cubic yards) of hazardous waste, 322 cubic meters (422 cubic
yards) of low-level mixed radioactive soil, 106 cubic meters (139 cubic yards)
of hazardous sludges, 437 cubic meters (572 cubic yards) of hazardous
paper/cloth, 570 cubic meters (747 cubic yards) of hazardous
liquids/wastewaters, 6 cubic meters (7.9 cubic yards) of low-level mixed
sludge, 23 cubic meters (30.1 cubic yards) of low-level mixed paper/cloth and
94 cubic meters (123 cubic yards) of low-level mixed liquids and wastewater,
and 156 cubic meters (204 cubic meters) of sanitary waste.
Pond Waste Management Project
This project includes dewatering, repacking, and disposing of more than 70,000
drums of partially solidified and raw sludge stored on external pads at the
K-25 Site (the K1417 Concrete Block Casting and Storage Yard and the
K1419 Sludge Fixation Facility). It also includes cleanup of the
associated facilities.
REMEDIAL ACTION
The assessment of the drum contents (both solidified and raw sludge) was
completed prior to FY 1995 and indicated contamination by metals, organics, and
radionuclides in the containerized sludge. Future assessment activities are
planned only in conjunction with Resource Conservation and Recovery Act closure
of the pad and equipment. This report assumes that these assessments will
include radiological surveys of the asphalt pad, radiological statistical
sampling of metal components for potential release of the equipment, and soil
sampling beneath the pad once it is removed. Data assessments have been used to
support storage, offsite treatment, and ultimate disposal of the waste.
Assessment of soil contamination remaining at the facilities following removal
of the asphalt pad will be done under future Comprehensive Environmental
Response, Compensation, and Liability Act action.
Remediation of soil contamination around the K1417 and K1419
facilities is deferred to future Comprehensive Environmental Response,
Compensation, and Liability Act action. The K1417 and K1419
facilities will not be released for future use until decommissioning is
complete and soil contamination is assessed. This estimate assumes No Further
Action will be needed. This report also assumes that remedial actions for the
Pond Waste Management Project will be completed by FY 2001.
Crushed drums remaining from the repackaging process will be transported to a
commercial vendor, Scientific Ecology Group in Oak Ridge, Tennessee, for
smelting. The solidified waste is currently stored in drums inside various
K25 buildings and is being shipped to commercial disposal facilities at
Envirocare of Utah.
The raw sludge is currently stored in containers in the K1065 Building.
During FY 1995, waste sludges from the Pond Waste Management Project were
repackaged into polymer bulk storage containers and transported from the
process plant area for temporary compliant storage within the K1065
buildings. A subcontract for offsite treatment and disposal of the raw sludge
has been procured. The subcontractors' proof-of-process for treatment of the
raw sludge was completed in FY 1995. Shipment of the drums offsite for
treatment and disposal is scheduled to begin in FY 1996. The State of Tennessee
Commissioner's Order implementing the requirements of the Federal Facilities
Compliance Agreement drives the schedules for completion of treatment and
disposal of this waste. These activities will involve coordination with the
Waste Management program.
This report assumes that approximately 3,664 cubic meters (4,800 cubic yards)
of low-level radioactive media generated by remedial actions will be disposed
of offsite by the Environmental Restoration program (including the crushed
drums). The remaining waste generated by remedial actions will be transferred
to the K-25 Site Waste Management program. These include approximately 124
cubic meters (162 cubic yards) of solid low-level radioactive waste and 136
cubic meters (178 cubic yards) of low-level radioactive mixed wastewaters.
Ground Water
Ground water at the K-25 Site is treated as one operable unit. Broad
characterization activities of the geology and hydrogeology are used to
establish a baseline to support risk ranking and identification of
contamination sources.
ASSESSMENT
The ground-water program is in the process of establishing a site-wide baseline
for future assessments. The sampling of several monitoring wells is required by
state and federal regulators under underground storage tank regulations,
Resource Conservation and Recovery Act post-closure monitoring, and the
Comprehensive Environmental Response, Compensation, and Liability Act. In FY
1995, two rounds of sampling were conducted on over 200 wells. Analytical
results from this sampling were used to reduce the list for a third sampling
round, which is now completed. Data quality objectives established prior to the
initiation of the monitoring program are suitable for performing
screening-level human health risk assessments.
In addition to sampling, water level measurements are in progress to assist in
assessing the hydrogeologic connection between the ground-water systems
(unconsolidated and bedrock zones), surface infiltration, and river influences.
Slug tests were completed for evaluating hydrogeologic properties of the
ground-water system. Microgravity surveys of several potential karst areas were
completed. The U.S. Geological Survey completed the second portion of a spring
and seep survey of the site.
Historical ground-water data for the years 1985 to 1993 were entered into the
Oak Ridge Environmental Information System. Annual ground-water monitoring
progress reports are prepared for submittal to the regulatory agencies. No
other Federal Facilities Agreement milestones have been established. This
report assumes that assessments for the Ground-Water Operable Unit will be
completed by FY 2040.
The current assessment approach includes using the results and data collected
during the Ground-Water Remedial Site Evaluation to develop a K-25 Site
site-wide Record of Decision for remedial action requirements and priorities.
This approach would eliminate the need for many of the further investigations
and assessments that are included in this estimate. However, the costs
associated with this approach are not included in this estimate.
REMEDIAL ACTION
This estimate assumes that the Department will conduct a two-phase Remedial
Investigation and Feasibility Study. Ground water is not currently used as a
source of drinking water; therefore, future ground-water use assumptions have
not yet been established. A minimum level of cleanup may be considered
appropriate for the next 25 years to control the release of contaminants and to
prevent contaminated ground-water plumes from expanding. These activities could
include pumping and treating water or capping sources of contamination.
Appropriate monitoring will be conducted to ensure that offsite migration of
contaminants does not occur. This estimate assumes that ground-water monitoring
will continue until FY 2045.
This report assumes that over 456,000 cubic meters (597,360 cubic yards) of
hazardous waste and 488,000 cubic meters (639,280 cubic yards) of low-level
mixed radioactive ground water will be treated by the Environmental Restoration
program.
Decommissioning
The K-25 Facilities Decommissioning program comprises surveillance and
maintenance activities and decommissioning projects at the K-25 Site.
Surveillance and maintenance activities include performing periodic
building/facility inspections and correcting identified deficiencies that would
otherwise result in an insult to the environment, jeopardize the public and/or
site's health and safety, or adversely affect national security through the
loss of classified technology or special nuclear material. Surveillance and
maintenance activities encompass 1.2 million square meters (13 million square
feet) in 82 facilities at the K-25 Site. Decommissioning includes projects to
remove hazards left in the gaseous diffusion facilities at shutdown, ensuring
the protection of worker health and safety, regulatory compliance, and
demolition or preparation for reuse of facilities. The Department is conducting
all decommissioning activities at the K-25 Site under the Comprehensive
Environmental Response, Compensation, and Liability Act regulatory process. All
deliverables will be part of Federal Facilities Agreement prioritization.
Projects included in this activity include uranium hexafluoride cylinders
inspection and integrity assessment, uranium deposit removal, planning for the
cleanup of several site areas, safety documentation updates, and surplus
material management. The Department is using task order contracting and special
integrated project management teams to implement key projects.
| ACTIVITIES TO DATE
Activities included cleanup of 17 orphan facilities that were added to the
program in FY 1993 and removal of 1.1 million liters (295,000 gallons) of
lubricating oil for destruction at the Toxic Substances Control Act
Incinerator; shipment of approximately 1 million kilograms (2.3 million pounds)
of R-114 coolant for reuse; removal of 1,605 cubic meters (2,103 cubic yards)
of various waste materials; shipment of over $10 million of process equipment
for reuse; and decontamination of 5,766 square meters (6,882 square yards) of
work areas. Activities also included closure of 6,304 Occupational Safety and
Health Act findings; cleanup of 154 polychlorinated biphenyl spill sites;
inspection of the Resource Conservation and Recovery Act facilities; inspection
of uranium hexafluoride cylinder baseline; shipment of 912 uranium hexafluoride
feed cylinders; removal of 15 kilometers (9.4 miles) of asbestos-containing
insulation; removal and disposal of 469,960 liters (124,000 gallons) of Askarel
fluids and 400,700 liters (106,000 gallons) of mineral oil containing
polychlorinated biphenyls; offsite disposal of 9,500 polychlorinated
biphenyl-containing capacitors; upgrade of contamination control station in
process buildings; demolition of six large cooling tower superstructures;
demolition of ten powerhouse facilities; development of methodologies for
screening and baseline risk evaluation of facilities; and inspections of
electrical systems.
|
ASSESSMENT
In FY 1996, overall assessment of the demolition of auxiliary buildings will
involve an Engineering Evaluation/Cost Analysis and an action memorandum under
the Comprehensive Environmental Response, Compensation, and Liability Act. The
K-1410 Plating Facility Remedial Site Evaluation provided assessment of
existing radiological data for the building and grounds and the results of
shallow soil analyses to screen human health risks. The results of the Remedial
Site Evaluation concluded that current direct radiation exposure levels posed
an unacceptable risk to onsite workers. To address this conclusion, a removal
action is planned under the Decommissioning program.
Also in FY 1996, the K1131 Feed and Withdrawal Building, the K1410
Plating Facility, the K-725 Beryllium Building, and the K-724 Warehouse
Building will be addressed under a separate Engineering Evaluation/Cost
Analysis and associated action memorandum. Demolition of these building
superstructures is planned for FY 1997
and beyond. Remediation of subgrade contamination will be addressed on a
site-wide basis under a site-wide Remedial Investigation/Feasibility Study.
Deliverables will be part of Federal Facilities Agreement prioritization.
Assessment of the K31 Roof is complete. Award of a demolition subcontract
for the roof replacement was completed in FY 1995.
DECOMMISSIONING
Stabilization activities for decommissioning facilities include, but are not
limited to, deactivation of surplus facilities to bring them to a safe shutdown
condition to allow minimal surveillance and maintenance. Stabilization
activities may include limited demolition of internal structures and management
and disposition of surplus materials to reduce hazards. Uranium deposits with
criticality concerns are being removed from process equipment and piping. In FY
1996, work will be completed on pipe sections in the K25 Building. Uranium
removal will continue through FY 1999. All costs associated with the
stabilization of facilities are included within the facility decommissioning
line item.
The estimate for the decommissioning of the gaseous diffusion facilities has
recently been reevaluated using several different scenarios. The scenario
described in this report uses a new approach for recycling process equipment
and other radioactive metals into usable products. It also includes the onsite
disposal of low-level and mixed radiological waste in a Comprehensive
Environmental Response, Compensation, and Liability Act disposal unit. The
schedule for the decommissioning assumes that there will be two years of
planning in FY 1996 and FY 1997 and that the removal of the major components
will begin in FY 1998.
The regulatory strategy for the decommissioning is based on the May 22, 1995
joint Department of Energy-Environmental Protection Agency Policy on
decommissioning under the Comprehensive Environmental Response, Compensation,
and Liability Act. The policy provided guidance that indicated a preferred
method for conducting decommissioning and decontamination actions at the
Department of Energy sites, namely that decommissioning and decontamination
activities would be conducted as nontime-critical removal actions with the
associated Engineering Evaluation/Cost Analysis and Action Memorandums prepared
to document the decisions. As Comprehensive Environmental Response,
Compensation, and Liability Act actions, the analyses will have to incorporate
National Environmental Policy Act values and comply with the substantive
provisions of all applicable or relevant and appropriate requirements. This
process also provides for public involvement.
As noted in the National Contingency Plan, the Comprehensive Environmental
Response, Compensation, and Liability Act process provides for compliance with
the substantive provisions of applicable or relevant and appropriate
requirements unless compliance waivers are obtained from the appropriate
regulatory agencies. Onsite Comprehensive Environmental Response, Compensation,
and Liability Act actions also are exempt from permits. With regard to
decommissioning, this means that permits would not be required for air
emissions, wastewater discharges, or similar activities. Instead, the
substantive portions of the laws governing these resources would be applicable,
and lengthy permit reviews and approval requirements would not delay the
removal process.
The first major phase of decommissioning will be removing the major components
from the process buildings. These major components include motors; cell housing
and structural framing; compressors and converters; piping and valves;
instrumentation, instrument panels, and tubing; support equipment; electrical
equipment; utilities systems; and ventilation systems. In general, all
equipment will be removed in one piece unless it is more efficient to section
it for removal. The process piping and equipment will be cut loose so that it
can be removed from the cell. This report assumes adequate purging and the use
of portable high-efficiency particulate air ventilation systems to allow
workers to perform the work without respirators.
Safeguards and security requirements, including nuclear material control and
accountability practices for enriched uranium, are streamlined to the extent
necessary to allow the equipment removal and recycle contractors to perform
their work unimpeded. Contamination control will be adhered to so that the
removal process does not cause trackout problems or additional cleanup work
before the structure can be demolished. This estimate assumes that all
decommissioning activities for the gaseous diffusion facilities will be
completed in FY 2006 and that all remaining decommissioning activities,
including the centrifuge buildings, will be completed by FY 2040.
Following the removal of the equipment, the Department will remove loose
contamination from internal structural components (for example, walls, floors,
roofs) with a water spray and/or steam cleaning. The wash water will be
collected, recycled to the extent possible, treated, and discharged, with all
sludges disposed of in the onsite disposal cell.
This estimate assumes that all of the gaseous diffusion process buildings will
be demolished to show a complete decommissioning cost to the Department of
Energy. However, the Department is pursuing Industrial reuse of the facilities
and has not made final decisions as to which facilities, if any, will remain
and which will be demolished. The K-31 and K-33 Buildings are assumed to have
equipment removed, but their structures will remain until they are no longer
needed to support Environmental Management activities, and then they will be
demolished. Buildings K-1401 and K-1423, the Toxic Substances Control Act
Incinerator, the Central Neutralization Facility, the K-1515 Water Plant, the
K-1203 Sewage Plant, the K-802 Fire Water Supply System, and the K-731
Substation, along with their distribution systems, will remain for Industrial
reuse or ongoing program functions.
Buildings constructed with transite siding will require removal of
asbestos-containing material prior to structural demolition. This report
assumes that the transite siding and other building materials will be properly
wrapped and placed in the K-25 or K-27 vaults, as appropriate, prior to
demolition of the above-grade structure.
Nonprocess buildings, buildings that contain nonradiologically contaminated
equipment, and process buildings can be demolished by conventional means (that
is, heavy equipment such as wrecking balls). In most cases, segregation of
structural steel for recycle will take place during demolition or from
demolition rubble using heavy equipment. Demolition rubble will be used for
in-place backfill in cavities and/or left on the slabs-on-grade and covered
with a vegetative layer. All below-grade structures remain with utility lines
conduit, trenches, etc. capped off and left in place. The demolition fill will
not be placed in a manner that will provide an adequate foundation for future
development; however, no free liquids will be left in the rubble.
Metal materials removed from the buildings, including structural steel removed
during building demolition, will be transported to Nuclear Regulatory
Commission-licensed recyclers. The metal will be disassembled as necessary,
sized, smelted, milled, recycled where economically feasible, rolled and
fabricated into use for products such as storage and disposal boxes, barrels
and pallets. Melt slag and any unused metals will be transported back to K-25
for disposal. Radiologically contaminated metal waste from recycling will be
disposed of in the onsite disposal cells.
Certain metals or components such as structural steel and electrical system
cables will be evaluated for release and recycle as not contaminated. Process
system electrical motors will be processed by licensed recyclers for
decontamination and released if deemed technically achievable and economically
attractive. If generation of containers/products from the recycling process
exceeds the short-term demand, the excess inventory will be returned to the
plant and managed until needed.
Metals removed from the buildings will be smelted, and the resulting slag will
be disposed of in the onsite cell. With proper metallurgical processes,
radioactive contaminants migrate to the slag during smelting, with the
exception of technetium-99, which migrates to the metal. Other materials and
debris that cannot be recycled will also be disposed of in the cell. All waste
that will be disposed of in the cell is either low-level waste and/or mixed
waste.
Small levels of fixed radioactive contamination will remain on building
structures. An assessment of the amount of residual contamination left at the
building sites will be performed in the Streamlined Risk Evaluation in the
Engineering Evaluation/Cost Analysis to ensure that contamination left onsite
will not pose an unacceptable risk to human health and the environment.
Decommissioning projects to be completed in the near future include the cooling
towers demolition, the powerhouse demolition, and the K-31 Roof Replacement.
The superstructures of six cooling towers have been demolished. In addition to
the wood and incidental metals (such as bolts, nails, and brackets), other
materials in the superstructures (process and sprinkler piping,
asbestos-containing Munters fill and transite siding, fan shrouds and blades,
electrical conduit, and gearboxes) were removed. The wood, incidental metals,
and materials that contain asbestos will be disposed of in the Y-12 Plant
Landfill, and the remaining metal components will be segregated and transferred
to the K-770 Scrap Metal program for recycle.
Approximately 1,500 cubic meters (1,965 cubic yards) of the sediment contained
in the tower basins will be removed for disposal. The sediment will be
dewatered, solids containerized and transported to Envirocare of Utah for
disposal, and about 4.5 million liters (1.2 million gallons) of water will be
treated at the Central Neutralization Facility at the K-25 Site. The
above-ground concrete basins of towers D-892-G and K-892-H will be cleaned,
demolished, left in place, and covered with soil and vegetation. The K-892-J
basin will be cleaned, filled with construction rubble, and covered with soil
and vegetation. A portion of the west wall of the center basin between the G
and H towers will remain as the east wall of K-892 Pumphouse, which the K-25
Site will continue to use. The inground basins of towers K-861 and K-861-J will
remain in place and will be cleaned and used as earthen fill areas. Tower
K-1004-N has no separate concrete basin. A total of 29 facilities associated
with the six cooling towers will be demolished. The cooling tower
superstructures were demolished in FY 1995. The cooling tower basin sludge
removal and demolition of 29 related structures will continue in FY 1996, with
completion scheduled in FY 2000.
The Powerhouse Area encompasses approximately 16 hectares (40 acres) of land
located along the Clinch River within the K-770 Operable Unit. These facilities
comprise the main power production facilities built by the Manhattan Project in
1944. In the Powerhouse Area, 14 structures will be demolished. The power
production equipment was housed in the K-701, K-702, and K-703 facilities,
which are physically connected to one another. Separate from the three main
facilities are the K-705-A and -B and K-706 Water Intake and Pumping Facilities
and the K-707 Switch House. This large structure was used until 1994 to supply
power to the other facilities at the site. All other facilities included in
this project are small auxiliary support structures. Each of the facilities
included in this project, with the exception of K-707, has been stripped of
most equipment, leaving only the basic building structures. This project was
initiated to address those facilities in the area that, on the basis of process
knowledge, are not believed to have housed processes that involved radiological
materials and are believed to have minimal radioactive surface contamination.
Radiological surveys will be used to verify this assumption. Building K-702 is
the only facility where extensive amounts of stored materials have been found.
All materials stored in this facility were removed and surveyed. Ten of the 14
structures were demolished in FY 1995. The Powerhouse Area Project will be
completed in FY 1997.
Water damage has caused the K-31 Roof to deteriorate. This project will repair
and/or replace various sections of the existing seven-hectare (17-acre) roof.
Only sections of the roof that cannot be repaired will be removed and replaced.
Sections of the roof that can be salvaged will have the wetted roofing
materials removed and the entire section over-roofed. As a result, the project
will provide a new cover for the 69,750 square meters (750,000 square feet) of
roof associated with the K-31 process building. The K31 Roof will be
replaced in FY 1996 and FY 1997.
The Department will initiate also decommissioning of the K-725 Beryllium
Building in FY 1996. This report assumes that these actions will be conducted
as nontime critical removal actions under the Comprehensive Environmental
Response, Compensation, and Liability Act, according to the decommissioning
policy approved by the Department of Energy and the Environmental Protection
Agency in 1995.
This report assumes that approximately 843,861 cubic meters (1.1 million cubic
yards) of low-level radioactive metals and 29,535 cubic meters (38,691 cubic
yards) of solid low-level waste will be generated by decommissioning
activities. It is also assumed that the low-level radioactive metals will be
recycled and the residuals sent to the onsite disposal cell, and that the solid
low-level waste will be directly sent to the onsite disposal cell. This report
also assumes that approximately 263 cubic meters (345 cubic yards) of solid
hazardous waste, 8,898 cubic meters (11,656 cubic yards) of solid low-level
radioactive waste, 413,627 cubic meters (541,851 cubic yards) of solid
low-level mixed waste (mostly rubble), 200 cubic meters (262 cubic yards) of
polychlorinated biphenyl-contaminated waste, 4,742 cubic meters (6,212 cubic
yards) of sanitary waste and 60 cubic meters (78.6 cubic yards) of asbestos
will be left in place at the building sites.
It is also assumed that the K-25 Site Waste Management program will receive
approximately 631 cubic meters (827 cubic yards) of low-level radioactive
sludges, 55 cubic meters (72 cubic yards) of solid low-level radioactive waste,
12 cubic meters (15.7 cubic yards) of asbestos, 6,312 cubic meters (8,269 cubic
yards) of sanitary waste, and 30 cubic meters (39.3 cubic yards) of
polychlorinated biphenyl-contaminated waste.
Treatment, Storage, and Disposal
Low-level and mixed radiological waste from the decommissioning of the K-25
facilities will be disposed of in an engineered facility. An engineered
disposal cell will be located onsite, allowing low-level waste or mixed waste
generated from the recycle process to be placed in the cell. Instead of the
traditional permitting process, a Comprehensive Environmental Response,
Compensation, and Liability Act Remedial Investigation/Feasibility Study
followed by a Record of Decision will be used to determine the acceptability
for siting the onsite disposal cell. An assessment of the risk of the onsite
disposal cell will be performed as part of the Comprehensive Environmental
Response, Compensation, and Liability Act process. One intent of this process
is to pre-qualify the waste for placement in the waste disposal cell and to
identify any waste streams that are not appropriate for onsite disposal. This
waste will be treated, as required, and disposed of at offsite commercial
facilities or other Department of Energy facilities.
Long-Term Surveillance and Monitoring
All costs associated with long-term surveillance and monitoring are included as
one line item in this estimate. Routine surveillance and monitoring of inactive
waste sites prior to and following Comprehensive Environmental Response,
Compensation, and Liability Act remedial actions are conducted to maintain the
sites in a safe condition. Accomplishments in FY 1995 included erecting fencing
around contaminated areas within the K901 Operable Unit and installing
radiation signs for all fenced inactive waste sites. This report does not
anticipate any Federal Facilities Agreement deliverables under this activity
level, although an annual summary report of surveillance and monitoring
activities will be prepared.
Long-term surveillance and monitoring of environmental management facilities is
focused on controlling degradation of facilities and migrating of contaminants
to limit risks to human health, the environment, and future financial liability
to the Department of Energy. Routine surveillance of facilities is conducted as
deemed technically necessary to identify areas of concern or deficiencies for
correction prior to final decommissioning. The facilities are maintained in a
condition that will contain radiological and hazardous contamination, prevent
future release of hazardous materials to the environment, ensure adequate
protection for the health and safety of workers, and provide safeguards and
security for classified technology and special nuclear material. Facility
management includes routine management of the facilities, as well as business
management and site services coordination. Routine building management involves
upkeep of fire protection systems, polychlorinated biphenyls-contaminated
items, auxiliary support systems, alarm systems, building structures, roofs,
access control, and replacement or removal of asbestos. Other activities
include business management of the surveillance and monitoring program, health
and safety, environmental compliance, waste management, security, fire
protection, emergency management, nuclear materials control and accountability,
nondestructive assay, analytical services, quality, criticality safety alarms,
power, and utilities.
In FY 1995, surveillance and monitoring activities included the uranium
hexafluoride cylinders; however, management of these facilities is being
transferred from the Department's Environmental Management program to the
Nuclear Energy program in FY 1996. Such support has also included removing
combustible materials and cleaning out buildings to reduce the cost of
long-term surveillance and monitoring. This estimate assumes that long-term
surveillance and monitoring will be completed by FY 2045.
Environmental Restoration Activities Cost Estimate
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
|
| Main Plant Area
|
|
|
|
|
|
|
|
|
| Assessment
|
75
|
1,007
|
942
|
10,549
|
493
|
3,703
|
4,024
|
|
| Remedial Action
|
2,523
|
681
|
2,033
|
414
|
11,007
|
2,617
|
349
|
|
| External Plant Area
|
|
|
|
|
|
|
|
|
| Assessment
|
1,372
|
208
|
121
|
1,276
|
|
39
|
|
|
| Remedial Action
|
21
|
|
|
417
|
1,316
|
14,153
|
3,336
|
|
| Process Plant Area
|
|
|
|
|
|
|
|
|
| Assessment
|
145
|
27
|
46
|
|
142
|
15,369
|
4,909
|
|
| Remedial Action
|
|
|
|
|
|
5
|
9,426
|
|
| Pond Waste Management Project
|
|
|
|
|
|
|
|
|
| Remedial Action
|
7,815
|
1,897
|
|
|
|
|
|
|
| Ground Water
|
|
|
|
|
|
|
|
|
| Assessment
|
1,240
|
|
|
|
|
4,555
|
5,619
|
|
| Remedial Action
|
|
|
|
|
|
|
|
|
| Decommissioning Area Actions
|
|
|
|
|
|
|
|
|
| Assessment
|
5,778
|
77 |
|
|
|
|
|
|
| Facility Decommissioning
|
113,275 |
116,360
|
19,617
|
|
88
|
11,690
|
10,251
|
|
| Treatment, Storage and Disposal
|
134,929 |
224,882
|
44,976
|
|
|
|
|
|
| Long-Term Surveil. and Monitoring
|
1,871
|
1,802
|
1,844
|
1,901
|
1,521
|
|
|
|
| Direct Program Management/Support
|
5,514
|
5,514
|
6,106
|
5,326
|
4,262
|
3,552
|
1,776
|
|
| Total |
274,559
|
352,454
|
75,687
|
19,883
|
18,829
|
55,683
|
39,690
|
|
| |
2050
|
2055
|
2060
|
2065
|
| Main Plant Area
|
|
|
|
|
|
|
|
|
| Assessment
|
1,229
|
|
|
|
|
|
|
110,112
|
| Remedial Action
|
1,859
|
1,398
|
801
|
|
|
|
|
118,413
|
| External Plant Area
|
|
|
|
|
|
|
|
|
| Assessment
|
|
|
|
|
|
|
|
15,081
|
| Remedial Action
|
5,899
|
950
|
46
|
|
|
|
|
130,690
|
| Process Plant Area
|
|
|
|
|
|
|
|
|
| Assessment
|
|
|
|
|
|
|
|
103,193
|
| Remedial Action
|
12,713
|
2,155
|
131
|
|
|
|
|
122,150
|
| Pond Waste Management Project
|
|
|
|
|
|
|
|
|
| Remedial Action
|
|
|
|
|
|
|
|
48,561
|
| Ground Water
|
|
|
|
|
|
|
|
|
| Assessment
|
5,910
|
3,333
|
|
|
|
|
|
103,285
|
| Remedial Action
|
|
1,576
|
2,356
|
|
|
|
|
19,660
|
| Decommissioning Area Actions
|
|
|
|
|
|
|
|
|
| Assessment
|
|
|
|
|
|
|
|
29,273
|
| Facility Decommissioning
|
7,396
|
5,621
|
|
|
|
|
|
1,421,489
|
| Treatment, Storage and Disposal
|
|
|
|
|
|
|
|
2,023,938
|
| Long-Term Surveil. and Monitoring
|
|
|
|
|
|
|
|
44,694
|
| Direct Program Management/Support
|
1,776
|
296
|
888
|
|
|
|
|
175,045
|
| Total |
36,782
|
15,329
|
4,222
|
|
|
|
|
4,465,584
|
| * Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
Direct Program Management/Support
Program management functions provide essential administration and oversight to
the environmental restoration activities at the K-25 Site. This support is
aimed at ensuring proper identification, characterization, remediation and
revitalization of the contaminated sites. Business management accounts for a
large portion of the program management. This includes the progress tracking,
contract management, facility management, and financial management (budget
preparation and control) for the K-25 Site projects. Project management
personnel for the Lockheed Martin Energy System, Inc. and support groups
provide project management support skills as well as coordination with the
other sites in the Oak Ridge Operations Office.
Federal employees oversee the contractors for the K-25 Site Environmental
Restoration program. However, their costs, are included in the Oak Ridge
Operations Office section of this report along with the "Integrating Contractor
Central Operations Office Support."
There has been a concentrated effort to reduce program management costs. Areas
of overlap of management and activities have been eliminated, and business
systems that required extensive personnel hours have been replaced by
electronic data bases and reporting systems.
| STAKEHOLDER INTERACTIONS
The Oak Ridge Operations Office conducted public participation activities for
the following sites in the Oak Ridge area: Oak Ridge Associated Universities
and Oak Ridge Institute for Science and Education, Oak Ridge K-25 Site, Oak
Ridge National Laboratory, Oak Ridge Reservation, Oak Ridge Reservation Offsite
Program, and the Oak Ridge Y-12 Plant. The office completed a mailing to
stakeholders in May 1995 announcing the availability of the 1995 report and
offering it by mail upon request. Articles about the report appeared in the
summer and fall 1995 editions of Environmental Update, a newsletter
distributed to 43,000 stakeholders, and the summer 1995 quarterly stakeholder
public meeting featured a Baseline Environmental Management Report poster
session. Approximately 75 stakeholders attended a workshop in August 1995,
where presenters took comments and answered questions. In response to public
comments, changes were made to the narrative for the 1996 report, clarifying
terms and addressing issues such as private reuse of facilities. If you would
like more information about the report or have questions about the results,
please contact:
|
Public Participation
Walter Perry
(423) 576-0885 perrywn@oro.doe.gov
|
Technical Liaison
Marianne Heiskell
(423) 576-0314 heiskellmm@oro.doe.gov
|
Public Affairs
Steve Wyatt
(423) 5760887 wyattsl@oro.doe.gov
|
WASTE MANAGEMENT
Waste management activities at the Oak Ridge K-25 Site provide for operation of
the Department of Energy's only permitted low-level mixed and polychlorinated
biphenyl waste incinerator, consolidated storage of low-level and low-level
mixed waste for the Oak Ridge Reservation, operation of onsite wastewater
treatment facilities, and support activities for the above. K-25 Site waste
management activities uniquely provide consolidated storage and treatment for
legacy and newly generated waste from across Oak Ridge Operations. These
consolidated storage and treatment activities serve Department of Energy waste
generators including Defense Programs, Energy Research, Nuclear Energy, and
Environmental Management (Environmental Restoration, Nuclear Material and
Facility Stabilization, and Waste Management programs). The objective of waste
management activities at the K-25 Site is to support the ongoing missions of
the waste generators. This is accomplished by maintaining and expanding current
capabilities to manage waste; emphasizing safe and compliant operations;
reducing legacy waste inventory; overseeing implementation of pollution
prevention programs, including waste reduction; and increasing efficiency in
all phases of operations. Liquid and solid waste managed at the K-25 Site
include low-level, low-level mixed, hazardous, and sanitary waste.
Waste streams at the K-25 Site have been prioritized, considering risk of
continued management, availability of treatment technology and capability,
volume of waste in storage, volume of waste generated annually, and, more
generally, the ability to show tangible progress in meeting the objectives of
the Federal Facility Compliance Act. In general order of priority, the
wastestreams at the K-25 Site are (1) mixed waste liquids to be treated in the
Toxic Substances Control Act Incinerator; (2) combustible solids also to be
treated in the Incinerator; (3) compressed gases; (4) aqueous liquids to be
treated in existing facilities; (5) unstabilized Pond Waste Management Project
sludges; (6) waste covered under existing treatment variances (that is,
toxicity-characteristic waste); and (7) Toxic Substances Control Act
Incinerator residues. Remaining wastestreams, including contact- and
remote-handled transuranic solids, inorganic solids and debris,
no-radioactivity-added waste, and other waste targeted for treatment via the
broad spectrum procurement and the transportable vitrification system, were
assigned lower priorities and are not rank-ordered.
In recognition of its commitment to pollution prevention, the Oak Ridge
Operations is piloting a charge-back program where generators are assessed fees
based on type and quantity of waste generated. The funds accrued through the
fee system will be set aside and made available for the implementation of waste
minimization and pollution prevention projects. This incentive will allow sites
to pinpoint the major sources of waste generation and will focus attention and
resources to minimize future waste generation and associated costs.
A revised cost estimate for decommissioning the three gaseous diffusion
facilities, including the K-25 Site, was issued in November 1995. The revised
cost estimate assumes large-scale metal recycling, rather than disposal, and
the construction of a low-level waste disposal cell on the Oak Ridge
Reservation. These two facets eliminate a large portion of the equipment
decontamination and offsite waste disposal previously assumed. As a result,
this report assumes that K-25 Site newly generated waste coming to the Waste
Management program for disposition will be significantly reduced beginning in
FY 1998, offsite disposition of Waste Management-owned inventory stored in K-25
process buildings will be accelerated to a five-year workoff period, and the
Waste Management program will assume ownership of the K-1065 ancillary storage
facilities.
This report assumes that the K-1065 facilities will be available to the Waste
Management program for continued onsite waste storage through FY 2020. It also
assumes that the Environmental Restoration program is responsible for costs
associated with construction and operation of the onsite low-level/low-level
mixed waste disposal cell; commercial sector treatment of legacy
polychlorinated biphenyl waste from decommissioning of all three gaseous
diffusion plants; processing secondary liquids in existing onsite waste
management facilities; and disposing of sludges.
The K-25 Site manages low-level mixed waste in accordance with the terms and
conditions contained in the September 1995 Tennessee Department of Environment
and Conservation Commissioner's Order. This Order specifies treatment
technologies and schedules for the treatment of all low-level mixed and
transuranic waste is based on information provided by the Department of Energy
in the Site Treatment Plan.
Consideration of transportation issues must be addressed prior to or during the
National Environmental Policy Act planning process. Costs for waste
transportation are budgeted in collection and transport activities by waste
type for onsite movement of waste and intersite movement (that is, between the
Y-12 Plant, the Oak Ridge National Laboratory, and the K-25 Site). Costs for
shipment to offsite Department of Energy and commercial sector facilities for
treatment and/or disposal are included in treatment and/or disposal budgets, as
applicable.
Major Waste Management Projects Cost Estimate
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
2030
|
| Central Neutralization Facility
|
5,826
|
6,092
|
3,974
|
3,445
|
3,445
|
1,120
|
|
119,514
|
| K-1202, K-1420A Tank Storage
|
264
|
293
|
293
|
293
|
293
|
|
|
7,180
|
| LLW Storage Units
|
956
|
332
|
|
|
|
|
|
6,439
|
| Regulated Storage Units
|
3,409
|
2,666
|
2,007
|
2,000
|
2,000
|
880
|
|
64,808
|
| TSCA Incinerator - Liquids & Soft Solids
|
29,642
|
28,485
|
28,446
|
28,380
|
28,380
|
2,000
|
|
726,664
|
| * Project costs represent a subset of total Waste
Management costs.
|
| ** Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
Major Waste Management Activity Milestones
| Low-Level Mixed Waste Operations
|
2060
|
|
Low-Level Waste Operations
|
2060
|
|
Hazardous Waste Operations
|
2060
|
|
Sanitary Waste Operations
|
2060
|
Low-Level Mixed Waste
Low-level mixed waste stored and generated at the Oak Ridge K-25 Site is
managed according to the terms and conditions in the September 1995 State Order
and modified Site Treatment Plan. This order specifies treatment technologies
and schedules for the treatment of all low-level mixed waste based on
information provided by the Department of Energy in the Site Treatment Plan.
The feasibility of a low-level mixed waste and low-level waste disposal unit
located on the Oak Ridge Reservation and regulated under the Comprehensive
Environmental Response, Compensation, and Liability Act is currently being
evaluated.
GENERATION AND HANDLING
The primary generator of low-level mixed waste at the Oak Ridge K-25 Site is
the Department of Energy's Environmental Management program (environmental
restoration activities); however, Defense Program activities also generate some
low-level mixed waste at the site. This report assumes that all costs
associated with characterization and certification are the responsibility of
the generator. However, costs associated with the classification, packaging,
collection and tracking of low-level mixed waste are included within the scope
of the Waste Management program.
This baseline report assumes that a total of 16,000 cubic meters (20,960 cubic
yards) of solid low-level mixed waste will transfer to the Waste Management
program over the life cycle of this estimate. This report assumes that
environmental restoration activities will generate approximately 3,700 cubic
meters (4,847 cubic yards) of solid low-level mixed waste through FY 2045. The
annual generation rate will vary with the project schedules.
This report also assumes that Defense Programs activities will generate
approximately 12,300 cubic meters (16,113 cubic yards) of solid low-level mixed
waste, with volumes of approximately 2,400 cubic meters (3,144 cubic yards) per
year moved to the K-25 Site between FY 1998 and FY 2002 for storage.
TREATMENT
The current treatment strategy relies on a combination of approaches: (1)
treatment in existing facilities, (2) private sector treatment, (3) disposal in
lieu of treatment for waste with treatment variances, (4) development of
limited new onsite facilities, and (5) treatment at other Department of Energy
facilities, if required. The modified Site Treatment Plan calls for treatment
of the following mixed waste generated and/or stored at the K-25 Site by FY
2007 or earlier: mixed waste liquids, combustible solids, explosive waste,
compressed gases, aqueous liquids, unstabilized Pond Waste Management sludges,
waste covered under existing variances, and Toxic Substances Control Act
Incinerator residues. Schedules for treating the remaining mixed waste streams
are extended to about FY 2020.
The September 1995 State Order and the modified Site Treatment Plan govern this
strategy. The Site Treatment Plan delineates how the Department of Energy will
treat the site's mixed waste or develop technologies when they do not exist or
when existing technologies need to be modified. For some waste streams, plans
and schedules for characterizing waste for treatment, for undertaking
technology assessments, and for providing the required plans and schedules for
developing capacities and technologies, as appropriate, are provided. The Site
Treatment Plan applies specifically to mixed waste streams on the Oak Ridge
Reservation. The Site Treatment Plan serves multiple purposes including:
fulfilling requirements of the Federal Facility Compliance Act; establishing an
enforceable framework from which the Department of Energy will develop methods
to treat all land-disposal- restricted mixed waste currently in storage and to
be generated/received during the term of the Site Treatment Plan; allowing
compliant storage of waste pending treatment and disposal; and fulfilling the
requirement for a treatment methods plan for the June 1992 Federal Facility
Compliance Agreement between Department of Energy and the Environmental
Protection Agency Region IV.
The untreated mixed waste inventory generated and/or stored at the K-25 Site
consists solely of low-level mixed waste. All transuranic waste is located at
the Oak Ridge National Laboratory, and management of this waste is discussed in
that section of the Baseline Environmental Management Report. All low-level
mixed waste that is not subject to an exemption or variance will be treated to
meet the applicable concentration- or technology-based treatment standard.
Also, low-level mixed waste containing polychlorinated biphenyls or halogenated
organic compounds must be treated using specified technologies. Treatment
planning can be categorized as follows: (1) mixed waste streams for which
treatment technology exists; (2) mixed waste requiring further characterization
or technology adaptation; and (3) other mixed waste. The objective of treatment
is to produce a final waste form that can be disposed.
Treatment options use existing or modified onsite facilities and private sector
capabilities to treat those waste streams for which technology exists. Five
technology-based waste groups have been identified: incineration,
stabilization, neutralization, precipitation, and chemical oxidation. Aqueous
waste streams will be treated in existing, onsite wastewater treatment
facilities and may require some nominal pre-treatment, supplemental
characterization, and/or additional handling/bulking. Neutralization will be
used to treat corrosive waste. Precipitation will be used to treat aqueous
waste containing metals. Chemical oxidation will be used to treat
cyanide-bearing waste. Incineration is the required treatment technology for
approximately 40 waste streams on the Oak Ridge Reservation, including bulked
organic liquids, organically contaminated aqueous waste, scintillation fluids,
organic homogeneous solids, and organic debris. Several large and small volume
sludge streams are targeted for treatment through the private sector.
Waste is adequately characterized for continued safe storage; however, some
waste may require further characterization before treatment or disposal can be
determined. A broad spectrum contract with the private sector is planned to
further characterize and/or treat this waste. Bulk soils, containerized soils,
inorganic homogeneous solids (for example, wastewater treatment sludges),
inorganic debris (for example, filter elements, crushed light bulbs and
ballasts, lab packs, elemental mercury and other hazardous metals, batteries,
reactive metals, explosives, and compressed gases) comprise the majority of
waste in this category.
The Central Neutralization Facility and the Toxic Substances Control Act
Incinerator are the two mixed waste treatment facilities currently in operation
that are vital to the execution of the Commissioner's Order. The Central
Neutralization Facility and its associated piping, pumps, valves, and chemical
feed systems consist of the following major treatment equipment: two treatment
tanks with a working volume of approximately 66,325 liters (17,500 gallons)
each, one 227,400-liter (60,000-gallon) clarifier, two settling tanks with a
working volume of approximately 379,000 liters (100,000 gallons) each, and two
pressure filters. The current system provides pH adjustment, chemical
precipitation, sedimentation, and filtration for incoming waste streams. A
project is currently under way to add an air stripper, two carbon columns, and
an additional pressure filter. In addition, a centrifuge is used for the
dewatering of sludge produced by the treatment process. At the current time,
the primary waste streams treated are scrubber effluent from the Toxic
Substances Control Act Incinerator and K-1501 Steam Plant wastewaters.
The Toxic Substances Control Act Incinerator is currently only burning liquid
waste and limited amounts of solid waste. The waste feed system can handle
organic liquids, aqueous liquids, sludges, and solids. Organic liquids can be
fed to the rotary kiln or the secondary combustion chamber from several
agitated-feed tanks. Aqueous waste is also fed to the rotary kiln. Liquid waste
can be atomized with air or steam. The Toxic Substances Control Act Incinerator
will initiate limited treatment of combustible solids in FY 1996. Modification
of the off-gas and feed systems may be required and are being evaluated.
The K-1232 Treatment Facility was used to process significant flows of Y-12
Plant wastewater prior to startup of the West End Treatment Facility and the
Central Pollution Control Facility. At present, the treatment portion of K-1232
is not in use. This facility is currently being transferred to the
Decommissioning program.
STORAGE
There are approximately 19,000 cubic meters (24,890 cubic yards) of mixed waste
inventoried and stored at the K-25 Site. The total quantity of containerized
and bulk Toxic Substances Control Act Incinerator storage units is roughly 105
cubic meters (138 cubic yards). Waste storage facilities consist of modified
portions of former uranium
enrichment process buildings. Vaults used to store hazardous, mixed, and
polychlorinated biphenyl waste are constructed of reinforced concrete, interim
diking, and floors coated with chemical resistant sealant.
Low-level mixed waste will continue to be sent to the K-25 Site for storage
until the existing capacity is depleted. Consistent with the K-25
decommissioning estimate, processing and disposal of environmental restoration
pond sludges will be accelerated to provide K-1065 storage facilities to waste
management in FY 1996. In addition to allowing stored waste to be removed from
the K-25, K-31, and K-33 Buildings on the required schedule, it will also save
approximately $30 million by avoiding construction and operation of new mixed
waste storage facilities to replace the K-25 vault storage units and by
reducing the costs of operations from the K-25 vault storage units. The mixed
waste Site Treatment Plan schedule assumes all low-level mixed waste inventory
will be disposed by FY 2010 with no follow-on storage costs. This report
assumes that the K-1065 Building decommissioning cost will remain with the
Environmental Restoration program.
The types of waste that will be accepted for mixed waste storage at the K-25
Site include waste oils and petroleum-related products from general maintenance
activities, spent halogenated solvents from garages or electrical cleaning
activities, spent halogenated solvents used in degreasing operations at
garages, and spent nonhalogenated solvents from maintenance activities. They
also include discarded paints and related materials from maintenance
activities, aqueous and water-contaminated waste from general maintenance
activities, and acutely toxic and toxic commercial chemical products discarded
from laboratory activities. Cyanide- or sulfide-bearing reactive waste, and
corrosive and toxic waste from laboratory processes will also be accepted.
DISPOSAL
Commercial disposal is the planned option for disposing of mixed low-level
waste treatment residues and mixed low-level waste that have treatment
variances or that meet treatment standards. This estimate assumes that
toxicity-characteristic hazardous waste and residues from the Toxic Substances
Control Act Incinerator will be shipped to Envirocare of Utah under the current
land disposal regulations until FY 2020.
Low-Level Waste
Strategies for managing solid low-level waste at the K-25 Site have changed in
response to program influences. Three recent events have affected the strategy:
decline in disposal capacity, waste minimization, and changes in regulatory and
operational conditions. The current strategy for managing K-25 Site solid waste
includes: minimized generation through segregation, process control and
reuse/recycle; use of commercial vendors where cost-effective; waste volume
reduction and treatment prior to long-term storage or disposal; storage on the
Oak Ridge Reservation; and offsite disposal of stored inventory and future
generation.
This report expects the annual low-level waste generation volume for the K-25
Site to decrease significantly beginning in FY 1998, because all onsite
low-level waste generation results from the Environmental Restoration program.
Depending on availability of storage space, low-level waste from the Y-12 Plant
and the Oak Ridge National Laboratory may be moved to the K-25 Site for
consolidated storage. This estimate assumes that there will be no cost
associated with storage of low-level waste by FY 2002. This report also assumes
that all radioactive scrap metal generated on the Oak Ridge Reservation will be
recycled and managed by the Environmental Restoration program.
GENERATION AND HANDLING
The primary generator of low-level waste at the Oak Ridge K-25 Site is the
Department of Energy's Office of Defense Programs; however, environmental
restoration activities also generate some low-level waste at the K-25 Site.
This estimate assumes that all costs associated with characterization and
certification are the responsibility of the generator. However, costs
associated with classifying, packaging, collecting, transporting, and tracking
low-level waste are the responsibility of the Waste Management program.
This baseline report assumes that a total of 28,000 cubic meters (36,680 cubic
yards) of solid low-level waste will transfer to the Waste Management program
over the life cycle of this estimate. This report assumes that environmental
restoration activities will generate approximately 800 cubic meters (1,048
cubic yards) of solid low-level waste through FY 2045. The annual generation
rate will vary with the project schedules.
This report also assumes that Defense Programs activities will generate
approximately 27,200 cubic meters (35,632 cubic yards) of solid low-level
waste, with volumes of approximately 5,500 cubic meters (7,205 cubic yards) per
year moved to the K-25 Site between FY 1998 and FY 2002 for storage.
TREATMENT
Commercial volume reduction of low-level waste is used to reduce storage and
disposal requirements.
STORAGE
The K-25 Site low-level waste storage facilities consist of modified portions
of former uranium enrichment process buildings. Commercial volume reduction
services mitigate the shortage of low-level waste storage capacity. Waste in
storage is nondestructively assayed to certify that it meets the acceptance
criteria at the receiving facilities.
The low-level waste in storage will be disposed of at a rate of 20 percent of
the storage volume per year until FY 2002, when all the K-25 Site inventory is
disposed. Storage costs at the K-25 Site will be significantly reduced by FY
2002. Continuation of the K-25 Site for consolidated storage of Waste
Management-owned low-level waste would be an option after FY 2002.
DISPOSAL
The current strategy for disposal at the K-25 Site varies according to isotopic
content and radionuclide concentration of the waste and the specific disposal
facility and technology. The strategy to ensure disposal capability for all
low-level waste generated at the K-25 Site relies on a combination of onsite
and offsite facilities. Onsite disposal of low-level waste is primarily limited
to mixed fission product waste generated at the Oak Ridge National Laboratory.
Although the Department is currently pursuing plans for a disposal facility,
this report assumes that the long-range disposal strategy for low-level waste
will be offsite disposal at the Nevada Test Site.
The option of an onsite disposal facility for legacy low-level mixed waste and
legacy low-level waste to be regulated under the Comprehensive Environmental
Response, Compensation, and Liability Act is being pursued. This facility could
be used to dispose of the K-25 Site stored inventories and waste generated by
the Environmental Restoration program at the K-25 Site.
Hazardous Waste
The strategy for managing hazardous waste at the K-25 Site involves reducing
waste generation; obtaining no-added-radioactivity determinations to
disposition current inventories and newly generated hazardous waste using
commercial sector treatment; and continued treatment in existing onsite
facilities. Management of hazardous waste relies on commercial treatment and
disposal of the waste. All hazardous waste certified to be nonradioactively
contaminated will be shipped to a commercial treatment, storage, disposal, or
recycle facility for final dispositioning. In accordance with the requirements
of the Resource Conservation and Recovery Act and its implementing regulations,
the waste will be treated and disposed of within one year of generation. No
long-term storage is required for this waste and storage is limited to
accumulation of sufficient quantities to facilitate treatment.
GENERATION AND HANDLING
The primary generator of hazardous waste at the Oak Ridge K-25 Site is the
Department's Environmental Management program (environmental restoration
activities); however, Defense Programs activities also generate some hazardous
waste at the K-25 Site. This estimate assumes that all costs associated with
characterization and certification are the responsibility of the generator.
However, costs associated with the classification, packaging, collection,
transport and tracking of hazardous waste are the responsibility of the Waste
Management program.
This baseline report assumes that a total of 55,000 cubic meters (72,050 cubic
yards) of solid hazardous waste will transfer to the Waste Management program
over the life cycle of this estimate. This report also assumes that
environmental restoration activities will generate approximately almost all of
this waste, with 53,000 cubic meters (69,430 cubic yards) of solid hazardous
waste generated by the Oak Ridge Reservation Offsite Programs. The annual
generation rate will vary with the project schedules.
TREATMENT
Limited onsite liquid hazardous waste treatment capability exists at the Toxic
Substances Control Act Incinerator and the Central Neutralization Facility.
Commercial offsite treatment with disposal is planned to treat the remaining
solid waste.
STORAGE
Storage facilities at the K-25 Site are used to store bulk waste chemicals that
have been packaged in accordance with Department of Transportation
requirements, small containers of laboratory chemicals and related waste, and
polychlorinated biphenyls and polychlorinated biphenyl-contaminated waste.
DISPOSAL
No onsite hazardous waste disposal capability exists. Hazardous waste is
disposed of in conjunction with commercial treatment contracts.
Sanitary Waste
The strategy for managing sanitary waste at the K-25 Site involves the use of
both onsite and offsite commercial facilities including the Anderson County
Landfill and the Y-12 Sanitary Landfill. Waste recycle opportunities will also
continue to be pursued to reduce the quantity of waste requiring disposal and
to extend the life of the disposal facilities. The Waste Management program has
no current or planned activities associated with the storage of solid sanitary
waste at the Oak Ridge K-25 Site.
GENERATION AND HANDLING
The primary generators of sanitary waste at the K-25 Site are the Department's
Office of Defense Programs and Landlord activities; however, Environmental
Management program activities (environmental restoration) also generate some
sanitary waste at the Laboratory.
This baseline report assumes that a total of 37,000 cubic meters (48,470 cubic
yards) of solid sanitary waste will transfer to the Waste Management program
over the life cycle of this estimate. This report assumes that environmental
restoration activities will generate approximately 7,000 cubic meters (9,170
cubic yards) of solid sanitary waste through FY 2045. The annual generation
rate will vary with the project schedules.
This report also assumes that Defense Programs and landlord activities will
generate approximately 30,000 cubic meters (39,300 cubic yards) of solid
sanitary waste, with volumes of approximately 1,200 cubic meters (1,572 cubic
yards) until FY 2023.
TREATMENT
This report assumes that upgrades will be initiated for the Central
Neutralization Facility so that the types and quantities of waste projected for
the future can be treated. The upgrade will ensure compliance with increasingly
restrictive regulations, and will meet National Pollutant Discharge Elimination
System permit requirements.
DISPOSAL
Industrial solid waste generated at the Oak Ridge K-25 Site, and waste
containing less than 35 picocuries per gram of radioactivity (total uranium)
are transported and disposed of at the Y-12 Industrial Landfill in accordance
with the state operating permit. At current generation rates, the existing
landfill has a life expectancy of greater than 50 years.
Offsite disposal is limited to specific waste streams that are generated in
areas known to be noncontaminated. This waste is disposed of in the Anderson
County Landfill.
Environmental Restoration Activities Cost Estimate
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
2030
|
| Low-Level Mixed Waste
|
|
|
|
|
|
|
|
|
| Treatment |
27,663
|
23,858
|
20,057
|
21,822
|
19,574
|
3,320
|
|
581,469
|
| Storage and Handling
|
3,637
|
2,923
|
2,293
|
2,293
|
2,293
|
880
|
|
71,592
|
| Disposal |
1,981
|
1,796
|
1,066
|
1,451
|
880
|
|
|
35,866
|
| Characterization and Retrieval
|
5,231
|
4,060
|
4,021
|
3,955
|
3,955
|
|
|
106,109
|
| Low-Level Waste
|
|
|
|
|
|
|
|
|
| Treatment |
13
|
|
|
|
|
|
|
64
|
| Storage and Handling
|
956
|
332
|
|
|
|
|
|
6,439
|
| Disposal |
2,289
|
1,634
|
109
|
158
|
345
|
|
|
22,680
|
| Hazardous Waste
|
|
|
|
|
|
|
|
|
| Treatment |
4,695
|
2,019
|
1,109
|
1,463
|
173
|
|
|
47,297
|
| Storage and Handling
|
36 |
36
|
7 |
|
|
|
|
396
|
| Sanitary Waste
|
|
|
|
|
|
|
|
|
| Treatment |
2,494
|
2,647
|
529
|
|
|
|
|
28,353
|
| Disposal |
549
|
2
|
5
|
7
|
|
|
|
2,811
|
| Direct Program Management/Support
|
33,622
|
33,069
|
29,291
|
28,909
|
28,909
|
3,813
|
|
788,065
|
| Total |
83,166
|
72,376
|
58,487
|
60,057
|
56,129
|
8,013
|
|
1,691,141
|
| * Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
Direct Program Management/Support
Program support activities for the Waste Management program encompass
activities that are necessary for, but not directly a part of, treatment,
storage, disposal, or related operations (for example, waste characterization,
collection, and transport). Program support activities include Department of
Energy and managing and operating contractor program management; oversight of
pollution prevention programs; general safety, health and environmental
compliance oversight; utilities for general support facilities; taxes;
procurement for general support activities; and establishment and maintenance
of waste information systems. The level of general program support is
proportional to treatment, storage, disposal, and related activities.
LANDLORD ACTIVITIES
The Department of Energy's Environmental Management program became the landlord
for the Oak Ridge K-25 Site in FY 1989. The Department of Energy's Uranium
Enrichment Program was the landlord before diffusion and centrifuge activities
were permanently shut down in 1987.
Landlord activities are segregated into two major components at the K-25 Site.
The site's landlord program is responsible for managing capital construction
and capital equipment projects to support the K-25 Site infrastructure and
general purpose or multiprogram facilities. These projects are funded directly
by the Environmental Restoration program. The second component of landlord is
the site overhead functions, which include such activities as security, fire
protection, roads and grounds, and general plant maintenance. The landlord
activities are expected to continue to be the responsibility of the
Environmental Management program. Although the K-25 Site's decommissioning
activities are expected to be completed by FY 2007, waste management (including
the Toxic Substances Control Act Incinerator) and remedial action activities
will continue after that time. Major infrastructures such as roads and water
and power systems will remain in place and will require periodic upgrades and
maintenance.
Landlord Cost Estimate
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
|
| Directly Appropriated Landlord
|
20,940
|
28,221
|
27,242
|
27,242
|
27,242
|
27,242
|
27,242
|
|
| |
2050
|
2055
|
2060
|
2065
|
| Directly Appropriated Landlord
|
20,254
|
13,503
|
6,751
|
|
|
|
|
1,129,395
|
| * Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
DESCRIPTION OF PERSONNEL
Current Composition
The employees of Lockheed Martin Energy Systems are engineers, scientists,
technicians, managers, construction crafts personnel, operators, laborers,
general workers, administrative professionals, general administrators, and
managers. Because several waste operations facilities are located at the K-25
Site, there is a larger percentage of operators than at other facilities. This
work force is expected to remain relatively stable over the next two years. In
addition, the Department of Energy contracts to Jacobs Engineering and Foster
Wheeler. Both companies predominantly employ scientists and engineers.
MK-Ferguson is the construction contractor. Lockheed Martin subcontracts to a
variety of engineering, consulting, and site investigation firms, including
several small disadvantaged businesses under the Small Business Administration
"8a" set aside program. The federal Full-Time Equivalents who provide support
and oversee the environmental management work at the K-25 Site are included in
the Oak Ridge Operations Office section of this report. The table below
presents the contractor work force by skill mix.
Full-Time Equivalent Composition Table*
* The Projections for Full-Time Equivalent employees are based on FY 1996
planning baselines (see Reader's Guide).
Site Management Structure
Lockheed Martin Energy Systems is the integrating contractor for the
environmental restoration activities at the K-25 Site for the Department of
Energy as well as the managing and operating contractor. They integrate their
own work activities as well as those of the Department of Energy prime
contractors for technical support, engineering and construction, and their own
subcontractors for site remedial investigation work.
The Lockheed Martin contract has recently been extended for an additional two
years, through March 1998. The new performance-based contract includes
objective performance measures, greater use of incentive contract provisions,
and increased accountability. Under the new contract, Lockheed Martin's
earnings will be based on a combination of performance metrics, cost
reductions, incentive projects, and award fees. It is expected that these
activities will result in significant streamlining and reduction of costly and
excessive administrative activities for both Lockheed Martin and the Department
of Energy. As a part of that contract, Lockheed Martin has committed to
incentive contracting as a part of contract reform. An increasing number of the
activities managed by Lockheed Martin will be task order contracts. The primary
features of these task order projects are as follows: contracting companies
function as a team, the Department of Energy and the team negotiate terms of
the project; the team collects an incentive fee for finishing under budget but
absorbs a percentage of any cost overrun; the Department of Energy shares risk
of cost overruns; and streamlined bid specifications simplify the process and
reduce cost estimates.
This estimate assumes that the decommissioning of the plant will be performed
by a decommissioning project management contractor who will perform the project
management services necessary to execute the project and be responsible for the
overall success of the project. The Department of Energy and the
decommissioning project management contractor will use an incentive contracting
approach with various subcontractors.
| CONTRACTING OPPORTUNITIES
If you would like more information about performing work for the Department of
Energy's Environmental Management program at this site, please contact:
|
Major Procurements
Peter Dayton
Director
Procurements and Contracts Division., AD-42 United States Department of Energy
Oak Ridge Operations Office
P.O. Box 2001
Oak Ridge, TN 37831-8755
p: (423) 576-0795
f: (423) 576-9189
|
Small Business Procurements
Chiquita Young
Procurements and Contracts Division., AD-42 United States Department of Energy
Oak Ridge Operations Office
P.O. Box 2001
Oak Ridge, TN 37831-8755
p: (423) 576-5657
f: (423) 576-9189
|
Future Full-Time Equivalent Needs
The mix of needed Full-Time Equivalents supported by Environmental Management
in this estimate for the K-25 Site is assumed to remain fairly stable until FY
1998. However, when decommissioning activities begin, the number of Full-Time
Equivalents and the mix should change substantially. The yearly budgets will be
substantially higher and all areas of employment will rise. As the buildings
are cleared and demolished, heavy equipment operators, laborers, health and
safety personnel, and decontamination personnel will be needed. The
construction of the onsite disposal cell will require construction workers.
This report assumes that the permitting and reporting activities will be
streamlined to prevent a dramatic increase in the numbers of technical and
administrative personnel.
FUNDING ESTIMATE
The following tables present estimated funding information for the Oak Ridge
K-25 Site.
Defense Funding Estimate
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
|
| Environmental Restoration
|
274,559 |
352,454
|
75,687
|
19,883
|
18,829
|
55,683
|
39,690
|
|
| Waste Management
|
83,147
|
72,281
|
58,437
|
59,978
|
55,956
|
8,013
|
|
|
| Directly Appropriated Landlord
|
20,940
|
28,221
|
27,242
|
27,242
|
27,242
|
27,242
|
27,242
|
|
| Total |
378,646
|
452,956
|
161,366
|
107,104 |
102,027
|
90,937
|
66,932
|
|
| |
2050
|
2055
|
2060
|
2065
|
| Environmental Restoration
|
36,782
|
15,329
|
4,222
|
|
|
|
|
4,465,584
|
| Waste Management
|
|
|
|
|
|
|
|
1,689,063
|
| Directly Appropriated Landlord
|
20,254
|
13,503
|
6,751
|
|
|
|
|
1,129,395
|
| Total |
57,036
|
28,832
|
10,973
|
|
|
|
|
7,284,042
|
| * Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
Nondefense Funding Estimate
| (Five-Year Averages, Thousands of Constant 1996
Dollars)
|
| |
2025
|
2030
|
| Waste Management
|
19
|
95
|
50
|
79
|
173
|
|
|
2,078
|
| * Total Life Cycle is the sum of the annual costs in
constant FY 1996 dollars.
|
COMPARISON WITH PREVIOUS ESTIMATE
The 1996 life-cycle cost estimate for the K-25 Site is 64 percent lower ($12.9
billion) than the 1995 estimate, after taking 1995 expenditures into account.
The FY 1995 Baseline Environmental Management Report used an estimate for the
decommissioning of the gaseous diffusion plants that was prepared in 1991 by
Ebasco Corporation for the Department of Energy. The estimate was for a "clean
closure" of the site. This included removing everything from the buildings,
treating the contents at major support facilities (low assay decontamination
facilities), and disposal of the waste offsite. The new estimate assumes that
much of the metal in the buildings and process equipment will be recycled and
that waste will be disposed onsite. These assumptions dramatically reduce the
cost and schedule for decommissioning the facilities. Direct program
management/support is now included in this activity.
The incorporation of decommissioning into the Environmental Restoration program
has resulted in a change in the way that eventual cleanup of the K-25 Site is
accomplished. Because this is not reflected in the existing program baseline
estimate, discrepancies exist between projects listed in this report (and
therefore milestones) and those on the prioritization schedule. The costs and
schedules of implementation in the baseline are being revised to reflect the
latest program guidelines and planning, but the changes were not available in
time to be shown in this report.
The FY 1996 Baseline Environmental Management Report estimates for Waste
Management program activities at K-25 Site now include: proportionate shares of
centralized mixed waste program costs (previously all reported under K-25 Site,
reflecting how funds are managed); decommissioning costs for currently
operating and planned Waste Management-owned facilities; increased use of
offsite facilities for low-level waste and low-level mixed waste disposal; and
reduced waste projections from the Environmental Restoration program.
Collectively, these changes reduced estimated Waste Management program costs by
almost 75 percent.
The major difference between the FY 1995 Baseline Environmental Management
Report and this report in regard to landlord costs is the timing of the start
of the decommissioning activities. The FY 1995 estimate assumed that there
would be several decades of landlord activities and surveillance and
maintenance before funds became available for decommissioning. In this
estimate, the work is scheduled to begin in FY 1998. This greatly reduces the
costs for landlord activities at the site.
Comparison Table
| |
Thousands of Dollars
|
|
| Nuclear Mat. & Fac. Stab.
|
- |
-
|
-
|
-
|
- |
| Environmental Restoration
|
8,812,471 |
116,700
|
4,465,584 |
4,230,187
|
49 |
| Waste Management |
6,565,825
|
104,600 |
1,691,141
|
4,770,084 |
74
|
| Landlord |
1,735,864
|
19,100 |
1,129,395
|
587,369 |
34
|
| Program Management 2
|
3,362,200 |
13,600
|
- |
-
|
-
|
| Site Total |
20,476,360
|
254,000 |
7,286,120
|
12,936,240 |
64
|
1 The FY 1995 life-cycle and annual costs are provided
to determine the corrected FY 1995 cost.
2 Program Management was reported in an independent cost table last year, but
is reported as a line item in the relevant program (Nuclear Material and
Facility Stabilization, Environmental Restoration, and Waste Management)
activity cost estimate tables for the FY 1996 Baseline Report.
|
|
 |